See what the voyage was fixed on, what operations now expects and what finance has posted, all in one voyage P&L.

 When a port stay runs long or a revised cost comes in, how quickly can your operations team see what it means for the voyage? 

 

The voyage was fixed on five and a half days in the load port. It took nearly seven. The operator knows why and has already spoken to the agent. Then the revised port cost comes in, and someone in chartering asks what the delay did to the voyage result.

That should be a straightforward question. But the original estimate might be in the voyage system, the revised cost in an email, and the latest figures in a spreadsheet. Finance may already have booked part of the cost. Before anyone can explain what changed, they have to work out which figures they're each looking at.

That's one of the handovers we wanted to simplify when we built Shipnet's web-based commercial and accounting platform. It is one system from estimate to ledger, with no integration in between.

Keep the estimate with the voyage

When a voyage is created from the fixed estimate in Shipnet, the figures it was fixed on become the baseline for operations. The expected port costs, bunkers, carbon costs, and voyage duration are there when the operator takes over. When the plan changes, there's a starting point to compare it with.

After more than 30 years of working with shipping teams, we know how often an operator needs to go back to the assumptions behind a fixture. A cost can look reasonable on its own. Seeing it alongside what was allowed for tells you whether it's worth investigating.


3-operations-voyage-events

The voyage starts with the figures it was fixed on. Each event after that shows what it did to them.

Every saved event also leaves a finance snapshot, so the voyage keeps a record of how its result moved and when. The P&L Trend view plots those snapshots over time and lists them underneath, each with the change it made.

7b-operations-voyage-pnl-trend-three-lines

The same voyage over time: TCE steps down as the bunker stem, the longer port stay, and the supplementary DA are saved.

See what the revised port cost does to the voyage result

Say the agent's revised estimate comes in higher after the extra day in port. Operations has a new figure to work with, even if the final invoice is still to come.

In Shipnet, estimated, updated, and accounting figures sit side by side. The Estimated column shows what was allowed for at fixture. The Updated column shows what operations now expects. The Accounting column shows what finance has posted. Looking at the port expenses line tells you where the figures differ and how the revision affects the voyage result.

In the example, port expenses move from USD 118,000 to USD 131,400. With the longer voyage and a higher bunker cost, the daily result moves from USD 33,606 to USD 30,774.

4-voyage-pnl

A revised port cost changes the updated voyage result. The fixed estimate and the posted figures stay visible alongside it.

 

That distinction matters when chartering asks how the voyage is performing. The operator can point to the cost that moved and explain why. Finance can see what's already posted and which costs operations still expects. The next conversation can be about the variance itself.

This is the second of three posts following one voyage. The first covered how the cargo was priced: Which ship should take this cargo? The last covers what finance does with the same figures at month-end: What still needs accruing on a voyage in progress?

Bring a voyage that moved away from its estimate

We built this for tanker and dry bulk operations teams that spend too much time piecing together what changed after fixture. If answering that question means pulling figures from spreadsheets, inboxes or separate systems, bring us an example from your operation.

The platform is built with shipping companies all over the world, and we're speaking with selected operators now. Talk to a Shipnet product specialist and bring a revised port cost, a longer-than-planned stay or another change you've had to explain. We'll walk through how you handle it today and show how the same change would look in Shipnet.


 

Tell us whether it's chartering, operations, or finance you'd like to see, and bring an example from your own operation. We'll come back to you to arrange a session.


new niall profile

Niall Jack

Chief Technical Officer

Let's talk

Let us know which of the Shipnet Suite of software tools interests you, and we'll get back to you to discuss how we can help.